Shovel Ready Work Stops Bike Route
I was not able to make the organized ride in Kountz that I thought about doing so I decided to drive to Splendora and start my ride there. This was necessary due to all of the construction on US59, FM1314 and FM1485 that I use to as jump off roads for my weekend rides. The shovels were flying and the concrete is pouring. This sign about sharing the road was fitting since I am sharing with all of the construction vehicles and workers.
I decided to record the route using Bikely.com. I have not used Bikely.com before so there was a learning experience figuring out how to get the route to appear.
The wildflowers are starting to bloom and I had my camera.